Work continues at a feverish pace to bring TOWER 500 from vision to reality. Multiple crews have been hard at work.
Every moment is one step closer to bringing TOWER 500 to fruition well on its way to rising 22 stories. The vertical structure slab has now reached the eighth floor, and concrete walls and columns are progressively taking shape up to the seventh floor. Framing will commence on the lower floors in the near future.
Interior selections have been finalized up to the seventh floor, with the final selections for the 8th floor due in January.