We have reached the 100ft mark! Halfway there.  Construction continues to progress at a rapid pace.  Windows and doors are installed up to the 5th floor, now starting on the 6th floor.  The lower level parking garage is taking shape with the first concrete pour.  And framing is beginning on the 5th and 6th floor.